A 558-metre timber factory for a sawmill town, held between two dark glulam truss walls that run past both ends of the building.

Wood Factory, collage
Fig. 01 · Collage
Wood Factory, plan
Fig. 02 · Plan
Wood Factory, elevation
Fig. 03 · Elevation
Wood Factory, section
Fig. 04 · Section

A CLT production hall for a sawmill on the Llobregat. The hall is long and thin, about 1:20, on a 6 m grid. Beech LVL shed girders carry prefabricated CLT roof cassettes; north glazing lights the floor without putting sun on the scanners, and photovoltaics take the south slopes. Every repeated part is a parametric Revit family, and every element carries a material passport so the building can be taken apart and used again.

Program
CLT production hall, 16,000 m²
My role
Individual project
Studio
Projects, La Salle Barcelona
Tools
Revit, pyRevit, Rhino, 3D-printed 1:200 model
Status
In progress